Photo report AKD-12 (May 11, 2021)
Testing of object No. 1 was carried out at AKD-12 (depth 1272-1279.9 m). At this object, the presence of gas was not previously confirmed by well logging, the object was tested for producing formation water in order to study the lower layers in this region (for seismic).
On May 8, object No. 2 was perforated (depth 1205.7-1217.1 m). On May 9 displacement of industrial water (injected) in the volume of 18 m3, call for inflow using a nitrogen plant. Then the well is closed for water recovery. Water withdrawal. Preparation for perforation of object No. 3 (interval 588.4-593m.) and testing (Kick off for gas inflow).